Ever-Power Team CO., LTD. IS Expert IN Generating ALL Kinds OF MECHANICAL TRANSMISSION AND HYDRAULIC TRANSMISSION LIKE: PLANETARY GEARBOXES, WORM REDUCERS, IN-LINE HELICAL Equipment Pace REDUCERS, PARALLEL SHAFT HELICAL Gear REDUCERS, HELICAL BEVEL REDUCERS, HELICAL WORM Gear REDUCERS, AGRICULTURAL GEARBOXES, TRACTOR GEARBOXES, Automobile GEARBOXES, PTO Travel SHAFTS, Particular REDUCER & Related Equipment Components AND OTHER Relevant Items, SPROCKETS, HYDRAULIC Program, VACCUM PUMPS, FLUID COUPLING, Equipment RACKS, CHAINS, TIMING PULLEYS, UDL Pace VARIATORS, V PULLEYS, HYDRAULIC CYLINDER, Gear PUMPS, SCREW AIR COMPRESSORS, SHAFT COLLARS Minimal BACKLASH WORM REDUCERS AND SO ON. If you require any info or samples, make sure you speak to us and you will have our shortly reply. Top quality and credit rating are the bases that make a company alive. EPTT EPTT Platform
EPTnical parameters of design cleansing cradle:
product | zlp500 | zlp630 | zlp800 | zlp1000 |
appearance | portray/hot galvanized | |||
fabrication content | steel/EPT alloy | |||
rated load | 500kg | 630kg | 800kg | 1000kg |
lifting velocity | nine-11m/min | nine-11m/min | eight-10m/min | 8-10m/min |
motor EPTT | 2×1.5kw | 2×1.5kw | 2×1.8kw | 2×2.2kw |
brake torque | 16km | 16km | 16km | 16km |
metal rope angle altering assortment | three deg-8 deg | 3 deg-eight deg | 3 deg-eight deg | three deg-eight deg |
length amongst two metal rope | le100mm | le100m | le100m | le100m |
counter fat(optional) | 25kgx30pcs | 25kgx36pcs | 25kgx40pcs | 25kgx44pcs |
diameter of steel rope | eight.3mm | 8.3mm | 9.1mm | 10.2mm |
max lifting peak(m) | 300m | 300m | 300m | 300m |
motor rotation pace | 1420r/min | 1420r/min | 1420r/min | 1420r/min |
voltage(3phases)(optional) | 220v/380v/415v/440v 50hz/60hz to be OEM |
Show
Principal Areas of construction cleansing cradle:
1. construction cradle(basket): Steel or EPTT Alloy (painted or very hot galvanized) | six. Steel wire rope: eight.3mm ,eight.6mm or 9.1mm |
two. Suspension System: Metal (painted or very hot galvanized) | seven. Basic safety rope: 18mm,20mm |
3. Electric hoists:LTD6.3 or LTD8 | 8. Electrical cable: 3*2.five 2*one.5 |
4. Protection Lock: LST30 | 9. Counterweights: Cement , cement with metal cover amp Iron counterweight |
5. Electric handle box: AEPTT with hoists | 10. EPT components |
EPTT and EPT
Offers Specifics of construction cleansing cradle for high properties and windows cleaning
package deal | system | counter weight | hoist amp security lock | management panel amp other smallparts |
movie | pallet | picket scenario | carton box |
Our EPTT
The suspended design cradle can be EPT according to customers’requirements(drawing, specs and so on).
Right after-sale companies
one.EPTT Assurance: Great quality is confident by EPTd producing EPT.and all merchandise will be checked by our high quality-management manager. |
2.Outstanding Package: We supply stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd,strong,protecting package for our items to avert is from outer harm. |
3.Speedily Response: Detailed details,distinct design and cost of cost of merchandise will be offered speedily right after acquiring your inquiry. |
Welcome to visit our manufacturing facility!
Any queries,Please truly feel free of charge to speak to me!